Guide to interior design project stages
Preparatory stage (before being appointed):
Review relevant information from the Client to confirm the Client’s strategic brief
First FOC meeting / on site if possible (no charge to client)
Preparation of Provisional Design Fee Estimate
Approval of Estimate by Client, agreement of T&C, and appointment of service
Stage 1: Preparation and Brief
Includes the development of the project objectives including overall visual direction, project research, clarifying and agreeing the brief, concept meetings with the Client, Contractor and other professionals where applicable, agreeing scope of works and reviewing specification
Establish design direction through visuals, source and presentation
Conduct site survey, measure areas if required / if plans not available
Define team, prepare the Responsibility Matrix, address any planning permit requirements
Review tender document with clients and other trade professionals to ensure scope of works/ specification covers all aspects of design
Review of Provisional Fee Estimate for design fees reflecting project brief
Provision of estimate for FFE/ Infrastructure / Interior finishes for project
Produce project timeframe
Stage 2: Infrastructure / Interior Finishes
Includes finalisation of space planning, furniture layouts, electrical and lighting layouts based on furniture layouts, bathroom design, all other aspects of designing the interior infrastructure, sourcing and design for hard finishes
Review space planning and room utilisation for all areas together with client and architect
Design furniture layouts for all rooms
Review radiator positions if specified in conjunction with furniture layouts where required
In conjunction with furniture layouts establish small Electrical power layouts, provide full layouts
In conjunction with furniture layouts establish lighting plan to include circuits and switching, provide full Lighting layouts.
Design bathroom layouts, plans and elevations with set out dimensions for plumber based on chosen sanitary ware
Work with client and professional on kitchen design , layout, choice of materials
Work with electrician to establish type of fitting Source/ propose type of switch plate/ socket. Source light fittings where applicable
Establish audio / home cinema requirements, audio visual proposal to be supplied by specialist, review setting out of ceiling speakers in conjunction with lighting layout
Compile floor finishes schedule specifying type of material
Source all floor finishes
Compile wall finishes schedule specifying type of material / or paint colour
Design internal door styles, architraves and skirting, provide drawings for contractor
Source ironmongery
Design architectural details (staircase, architrave, skirting)
Provide joinery visual references and design for wardrobes and other areas
Sourcing and specifying of sanitary ware & brassware
Freeze space plan & design concept
Review of budget and fees
Stage 3 – FFE - Furniture, Fixtures and Equipment
Includes development of material and furniture selections and interior schemes, presentation will be made in the form of packs, can be supported with 3D drawings if required at an additional cost
Design schemes for each room to include sourcing furniture, soft furnishings, window treatments
Administration of design schemes, placing and-co-ordination of orders and deliveries, obtaining all estimates, supplier liaison, providing specifications where applicable
Stage 4 – Meetings, Liaison, Co-ordination of project (construction stage)
Includes regular progress meetings with clients for stage 2 and 3.
Review of budget & fees
Check contractors insurances
Monitoring works when project is underway at regular intervals
Monitor variations
General Client meetings and liaison to discuss and sign off all decisions pertaining to the infrastructure of the house, liaison with other trades and contractor
Site meetings- liaising with Contractor, client and all trades to ensure project brief and works are being implemented as agreed
Client meetings and liaison to approve all proposed design schemes – FFE This may include sourcing trips with client for furniture, soft furnishings and kitchen design
Stage 5 – Installation
Hard case goods - accepting deliveries, inspecting, overseeing installation
Soft furnishing - accepting deliveries, inspecting, overseeing installation prior to snagging
Stage 6 - Handover
Carry out visual site inspections, Issue a schedule of defective works
Liaise with the Client, the Other Client Appointments and the Contractor in relation to the making good of defects
Inspect the remedial works following receipt of notice from the Contractor that the resolution of defective works is complete
Certify when the defective works have been rectified
Assist the Client and the Contractor to agree the final account and issue the final certificate
Project photography (with Client’s permission)
The document is prepared by Anastasia Antonova, in line with RIBA and BIID guidance